KRC Plumbing

For all your general plumbing needs

Home
About Us
News
Contact Us
Bathroom Refitting
Bathroom 1
Bathroom 2
Bathroom 3
Pictures
Links
Terms & Conditions
Bathroom Refitting
Please see below for before, during and after pictures of some of our bathroom refits

 

An upstairs bathroom tiled from floor to ceiling. The bath was not changed due to the unusual length. New toilet and basin were installed and the taps and waste fittings on the bath were also changed to match. An electric shower was installed.
 
 
  

An upstairs bathroom requiring the floor to be lifted and replaced in areas due to significant water damage. Pipework was re-routed under the lifted floor to reduce the amount of pipework on show. The room was then tiled from floor to ceiling and new sanitaryware installed. The shower was also replaced with a new unit. - Final pictures coming soon.
 
 
 
Bathroom 4 

New pictures coming soon